Steel Structure Civil Engineering

1. Preparation before construction: including checking technical data, implementing construction organization design, mastering the external environment before and after installation, joint review and self-review of drawings, etc. 2. Acceptance of foundation and supporting surface: acceptance of foundation and supporting surface to ensure compliance with design requirements. 3. Construction conditions: including component acceptance and installation marking, cleaning of operation surface, platform installation, component correction, assembly, etc. 4. Structural components in place, correction, temporary fixation: structural components in place, and correction and temporary fixation. 5. Installation procedure: first install the beam, roof truss, steel and other parts. 6. Inspection after installation: including component inspection report, welding test piece and concrete test piece inspection report, measurement record, lifting record, quality record, as-built drawing, etc. In addition, the construction steps of steel structure workshop mainly include construction setting-out, embedded bolts in foundation concrete, gantry frame hoisting, crane beam installation, steel beam installation, roof truss, roof panel and eave panel installation, wall panel installation, steel structure coating, etc.

Key words:

Product Description

The steel structure civil construction process generally includes the following steps:

1. Preparation before construction: including checking technical data, implementing construction organization design, mastering the external environment before and after installation, joint review and self-review of drawings, etc.

2. Acceptance of foundation and supporting surface: acceptance of foundation and supporting surface to ensure compliance with design requirements.

3. Construction conditions: including component acceptance and installation marking, cleaning of operation surface, platform installation, component correction, assembly, etc.

4. Structural components in place, correction, temporary fixation: structural components in place, and correction and temporary fixation.

5. Installation procedure: first install the beam, roof truss, steel and other parts.

6. Inspection after installation: including component inspection report, welding test piece and concrete test piece inspection report, measurement record, lifting record, quality record, as-built drawing, etc.

In addition, the construction steps of steel structure workshop mainly include construction setting-out, embedded bolts in foundation concrete, gantry frame hoisting, crane beam installation, steel beam installation, roof truss, roof panel and eave panel installation, wall panel installation, steel structure coating, etc.

Related Products

Get a Product Quote

Our staff will contact you as soon as possible. If you need other services, please contact us Email: wet009@163.com
WANERTE Yachen

Can't find the service you're looking for? Contact us!

 

To inquire about our products, please leave your email to us and we will contact you within 24 hours.

Contact Us


Telephone:+86 13802056867 

Landline:086 22-86220000

Address: Three Communities of Agricultural Corporation of Lutai Economic Development Zone, Tangshan City,China

We support customization

Submit
%{tishi_zhanwei}%
Business License